Fields / 2/1-16 S
2/1-16 S
Exploration, wildcatPlugged and abandonedDry
Drilled by Talisman Energy Norge AS with Mærsk Giant, 10.05.2013 to 13.07.2013 (64 days), to 3 891,0 m in the Ula Formation.
Water depth67,0 m
Total depth3 891,0 m MD
Vertical depth3 770,0 m TVD
Bottom-hole temperature-
Max inclination34,8°
Rotary table44,0 m
Formation at total depthUla Formation
RigMærsk Giant
Spud10.05.2013
Completed13.07.2013
OperatorTalisman Energy Norge AS
Position56,8505 N, 3,3146 E
Formations
28 tops reported, measured depth in metres.
Temperature
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 2/1-U-13 | 0,0 | 111,2 | - | - | 2012 |
| 2/1-U-14 | 0,0 | 106,6 | - | - | 2012 |
| 2/1-U-12 | 0,1 | 110,4 | - | - | 2012 |
| 2/1-12 | 2,2 | 3 550,0 | 125 °C | 1,62 | 1999 |
| 2/1-15 | 7,1 | 3 554,0 | 149 °C | - | 2013 |
| 2/1-U-16 | 7,2 | - | - | - | - |
| 2/1-U-15 | 7,2 | - | - | - | - |
| 2/1-U-17 | 7,2 | - | - | - | - |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 144,0 | 30" | 144,0 | - |
| Pilot hole | - | 843,0 | 12 1/4" | 843,0 | - |
| Surface casing | 20" | 853,0 | 24" | 861,0 | 1,69 LOT |
| Intermediate | 13 3/8" | 2 381,0 | 17 1/2" | 2 389,0 | 1,88 LOT |
| Intermediate | 9 5/8" | 3 358,0 | 12 1/4" | 3 365,0 | 1,84 FIT |
| Open hole | - | 3 891,0 | 8 1/2" | 3 891,0 | 2,14 FIT |
Mud weight
9 measurements, one dot each, 1,00 to 1,69 g/cm³ against measured depth, environmul, innovert, kcl gem polymer, kcl gem polymer prem, sea water.