Fields / 2/1-U-14
2/1-U-14
Other, soil drillingPlugged and abandoned
Drilled by Talisman Energy Norge AS with Bucentaur, 13.04.2012 to 17.04.2012 (4 days), to 106,6 m.
Water depth67,0 m
Total depth106,6 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table2,9 m
Formation at total depth-
RigBucentaur
Spud13.04.2012
Completed17.04.2012
OperatorTalisman Energy Norge AS
Position56,8508 N, 3,3148 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.