2/1-A-17
Development, injectionPluggedWater
Drilled by BP Norway Limited U.A. with Gyda in Gyda, 05.12.1990 to 23.01.1991 (49 days), to 4 423,0 m.
Water depth66,0 m
Total depth4 423,0 m MD
Vertical depth4 100,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table56,0 m
Formation at total depth-
RigGyda
Spud05.12.1990
Completed23.01.1991
OperatorBP Norway Limited U.A.
Position56,9048 N, 3,0852 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Gyda gradient | 37,0 °C/km |
| Estimated at total depth from the gradient | 151 °C |
The gradient is the median of 6 released wells in Gyda with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/1-A-17 A same well | 0,0 | 5 354,0 | - | - | 2004 |
| 2/1-A-18 | 0,0 | 4 622,0 | - | - | 1993 |
| 2/1-A-21 | 0,0 | 8 417,0 | - | - | 1997 |
| 2/1-A-13 | 0,0 | 7 268,0 | - | - | 1994 |
| 2/1-14 S | 0,0 | 6 130,0 | - | 1,66 | 2008 |
| 2/1-A-22 | 0,0 | 4 441,0 | - | - | 1991 |
| 2/1-A-14 | 0,0 | 4 130,0 | - | - | 1992 |
| 2/1-A-14 A | 0,0 | 4 747,0 | - | - | 1996 |
Casing and formation tests
No casing programme is reported for this wellbore.