WellplannerNorwegian shelf well data

Fields / Gyda / 2/1-A-22

2/1-A-22

Development, injectionPlugged and abandonedWater

Drilled by BP Norway Limited U.A. with Gyda in Gyda, 04.09.1991 to 16.10.1991 (42 days), to 4 441,0 m.

Water depth66,0 m
Total depth4 441,0 m MD
Vertical depth4 214,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table56,0 m
Formation at total depth-
RigGyda
Spud04.09.1991
Completed16.10.1991
OperatorBP Norway Limited U.A.
Position56,9048 N, 3,0851 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Gyda gradient37,0 °C/km
Estimated at total depth from the gradient156 °C

The gradient is the median of 6 released wells in Gyda with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/1-14 S0,06 130,0-1,662008
2/1-A-260,04 172,0--1992
2/1-A-230,04 975,0--1991
2/1-A-210,08 417,0--1997
2/1-A-180,04 622,0--1993
2/1-A-270,04 820,0--1992
2/1-A-27 A0,04 452,0--2007
2/1-A-190,04 580,0--1992

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗