WellplannerNorwegian shelf well data

Fields / Gyda / 2/1-A-19

2/1-A-19

Development, productionPluggedOil

Drilled by BP Norway Limited U.A. with Gyda in Gyda, 10.01.1992 to 08.03.1992 (58 days), to 4 580,0 m.

Water depth65,5 m
Total depth4 580,0 m MD
Vertical depth4 193,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table56,0 m
Formation at total depth-
RigGyda
Spud10.01.1992
Completed08.03.1992
OperatorBP Norway Limited U.A.
Position56,9048 N, 3,0851 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Gyda gradient37,0 °C/km
Estimated at total depth from the gradient155 °C

The gradient is the median of 6 released wells in Gyda with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/1-A-19 A same well0,04 630,0--2010
2/1-A-230,04 975,0--1991
2/1-A-200,04 387,0--1993
2/1-A-180,04 622,0--1993
2/1-A-150,04 360,0--1992
2/1-A-240,05 423,0--1992
2/1-A-24 A0,05 115,0--1992
2/1-A-24 B0,05 200,0--1995

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗