2/1-A-19 A
Development, productionPlugged and abandonedOil
Drilled by Talisman Energy Norge AS with Gyda in Gyda, 14.11.2010 to 25.11.2010 (11 days), to 4 630,0 m.
Water depth65,5 m
Total depth4 630,0 m MD
Vertical depth4 234,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table56,0 m
Formation at total depth-
RigGyda
Spud14.11.2010
Completed25.11.2010
OperatorTalisman Energy Norge AS
Position56,9048 N, 3,0851 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Gyda gradient | 37,0 °C/km |
| Estimated at total depth from the gradient | 156 °C |
The gradient is the median of 6 released wells in Gyda with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/1-A-19 same well | 0,0 | 4 580,0 | - | - | 1992 |
| 2/1-A-23 | 0,0 | 4 975,0 | - | - | 1991 |
| 2/1-A-20 | 0,0 | 4 387,0 | - | - | 1993 |
| 2/1-A-18 | 0,0 | 4 622,0 | - | - | 1993 |
| 2/1-A-15 | 0,0 | 4 360,0 | - | - | 1992 |
| 2/1-A-24 | 0,0 | 5 423,0 | - | - | 1992 |
| 2/1-A-24 A | 0,0 | 5 115,0 | - | - | 1992 |
| 2/1-A-24 B | 0,0 | 5 200,0 | - | - | 1995 |
Casing and formation tests
No casing programme is reported for this wellbore.