Fields / Gyda / 2/1-A-20

2/1-A-20

Development, injectionPlugged and abandonedWater

Drilled by BP Norway Limited U.A. with Gyda in Gyda, 07.04.1993 to 15.05.1993 (38 days), to 4 387,0 m.

Water depth66,0 m
Total depth4 387,0 m MD
Vertical depth4 024,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table56,0 m
Formation at total depth-
RigGyda
Spud07.04.1993
Completed15.05.1993
OperatorBP Norway Limited U.A.
Position56,9049 N, 3,0851 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Gyda gradient37,0 °C/km
Estimated at total depth from the gradient149 °C

The gradient is the median of 6 released wells in Gyda with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/1-A-190,04 580,0--1992
2/1-A-19 A0,04 630,0--2010
2/1-A-240,05 423,0--1992
2/1-A-24 A0,05 115,0--1992
2/1-A-24 B0,05 200,0--1995
2/1-A-160,04 972,0--1991
2/1-A-16 AY10,04 978,0--2004
2/1-A-16 AY20,05 102,0--2004

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗