2/1-A-16
Development, injectionPluggedWater
Drilled by BP Norway Limited U.A. with Gyda in Gyda, 26.10.1991 to 03.01.1992 (69 days), to 4 972,0 m.
Water depth65,5 m
Total depth4 972,0 m MD
Vertical depth4 255,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table56,0 m
Formation at total depth-
RigGyda
Spud26.10.1991
Completed03.01.1992
OperatorBP Norway Limited U.A.
Position56,9049 N, 3,0851 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Gyda gradient | 37,0 °C/km |
| Estimated at total depth from the gradient | 157 °C |
The gradient is the median of 6 released wells in Gyda with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/1-A-16 AY1 same well | 0,0 | 4 978,0 | - | - | 2004 |
| 2/1-A-16 AY2 same well | 0,0 | 5 102,0 | - | - | 2004 |
| 2/1-A-16 B same well | 0,0 | 4 938,0 | - | - | 2009 |
| 2/1-A-12 | 0,0 | 6 024,0 | - | - | 1996 |
| 2/1-A-20 | 0,0 | 4 387,0 | - | - | 1993 |
| 2/1-A-15 | 0,0 | 4 360,0 | - | - | 1992 |
| 2/1-A-11 | 0,0 | 4 801,0 | - | - | 1994 |
| 2/1-A-19 | 0,0 | 4 580,0 | - | - | 1992 |
Casing and formation tests
No casing programme is reported for this wellbore.