WellplannerNorwegian shelf well data

Fields / Gyda / 2/1-A-11

2/1-A-11

Development, injectionPlugged and abandonedWater

Drilled by BP Norway Limited U.A. with Gyda in Gyda, 25.08.1994 to 06.10.1994 (42 days), to 4 801,0 m.

Water depth66,0 m
Total depth4 801,0 m MD
Vertical depth4 107,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table56,0 m
Formation at total depth-
RigGyda
Spud25.08.1994
Completed06.10.1994
OperatorBP Norway Limited U.A.
Position56,9049 N, 3,0852 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Gyda gradient37,0 °C/km
Estimated at total depth from the gradient152 °C

The gradient is the median of 6 released wells in Gyda with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/1-A-70,04 215,0--1988
2/1-A-7 A0,05 163,0--2005
2/1-A-100,07 273,0--2008
2/1-A-150,04 360,0--1992
2/1-A-120,06 024,0--1996
2/1-A-60,04 897,0--1988
2/1-A-6 A0,04 507,0--1991
2/1-A-80,04 220,0--1987

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗