WellplannerNorwegian shelf well data

Fields / Gyda / 2/1-A-8

2/1-A-8

Development, productionPluggedOil

Drilled by BP Norway Limited U.A. with Vildkat Explorer in Gyda, 18.11.1987 to 10.01.1988 (53 days), to 4 220,0 m.

Water depth66,0 m
Total depth4 220,0 m MD
Vertical depth3 981,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table25,0 m
Formation at total depth-
RigVildkat Explorer
Spud18.11.1987
Completed10.01.1988
OperatorBP Norway Limited U.A.
Position56,9049 N, 3,0852 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Gyda gradient37,0 °C/km
Estimated at total depth from the gradient148 °C

The gradient is the median of 6 released wells in Gyda with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/1-A-8 A same well0,04 751,0--2002
2/1-A-70,04 215,0--1988
2/1-A-7 A0,05 163,0--2005
2/1-A-120,06 024,0--1996
2/1-A-40,04 550,0--1988
2/1-A-110,04 801,0--1994
2/1-A-30,04 747,0--1988
2/1-A-60,04 897,0--1988

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗