2/1-A-12
Development, injectionPlugged and abandonedWater
Drilled by BP Norway Limited U.A. with Gyda in Gyda, 09.05.1996 to 29.07.1996 (81 days), to 6 024,0 m.
Water depth66,0 m
Total depth6 024,0 m MD
Vertical depth4 250,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table56,0 m
Formation at total depth-
RigGyda
Spud09.05.1996
Completed29.07.1996
OperatorBP Norway Limited U.A.
Position56,9049 N, 3,0851 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Gyda gradient | 37,0 °C/km |
| Estimated at total depth from the gradient | 157 °C |
The gradient is the median of 6 released wells in Gyda with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/1-A-8 | 0,0 | 4 220,0 | - | - | 1987 |
| 2/1-A-8 A | 0,0 | 4 751,0 | - | - | 2002 |
| 2/1-A-16 | 0,0 | 4 972,0 | - | - | 1991 |
| 2/1-A-16 AY1 | 0,0 | 4 978,0 | - | - | 2004 |
| 2/1-A-16 AY2 | 0,0 | 5 102,0 | - | - | 2004 |
| 2/1-A-16 B | 0,0 | 4 938,0 | - | - | 2009 |
| 2/1-A-11 | 0,0 | 4 801,0 | - | - | 1994 |
| 2/1-A-7 | 0,0 | 4 215,0 | - | - | 1988 |
Casing and formation tests
No casing programme is reported for this wellbore.