2/1-A-8 A
Development, productionPlugged and abandonedOil
Drilled by BP Norge AS with Gyda in Gyda, 21.10.2002 to 15.12.2002 (55 days), to 4 751,0 m.
Water depth65,5 m
Total depth4 751,0 m MD
Vertical depth3 912,9 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table56,0 m
Formation at total depth-
RigGyda
Spud21.10.2002
Completed15.12.2002
OperatorBP Norge AS
Position56,9049 N, 3,0852 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Gyda gradient | 37,0 °C/km |
| Estimated at total depth from the gradient | 144 °C |
The gradient is the median of 6 released wells in Gyda with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.