Fields / Gyda / 2/1-A-2

2/1-A-2

Development, productionPluggedOil

Drilled by BP Norway Limited U.A. with Vildkat Explorer in Gyda, 21.02.1989 to 03.05.1989 (71 days), to 5 060,0 m.

Water depth66,0 m
Total depth5 060,0 m MD
Vertical depth3 796,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table25,0 m
Formation at total depth-
RigVildkat Explorer
Spud21.02.1989
Completed03.05.1989
OperatorBP Norway Limited U.A.
Position56,9049 N, 3,0853 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Gyda gradient37,0 °C/km
Estimated at total depth from the gradient141 °C

The gradient is the median of 6 released wells in Gyda with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/1-A-2 A same well0,05 289,0--2007
2/1-A-30,04 747,0--1988
2/1-A-60,04 897,0--1988
2/1-A-6 A0,04 507,0--1991
2/1-A-10,04 900,0--1989
2/1-U-80,0170,6--1987
2/1-A-70,04 215,0--1988
2/1-A-7 A0,05 163,0--2005

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗