Fields / 2/1-U-8
2/1-U-8
Other, soil drillingPlugged and abandoned
Drilled by BP Petroleum Dev. of Norway AS with Bucentaur, 19.04.1987 to 20.04.1987 (1 days), to 170,6 m.
Water depth67,1 m
Total depth170,6 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table2,9 m
Formation at total depth-
RigBucentaur
Spud19.04.1987
Completed20.04.1987
OperatorBP Petroleum Dev. of Norway AS
Position56,9049 N, 3,0853 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.