WellplannerNorwegian shelf well data

Fields / Gyda / 2/1-A-30

2/1-A-30

Development, productionPluggedOil

Drilled by BP Norway Limited U.A. with Gyda in Gyda, 23.07.1993 to 20.11.1993 (120 days), to 5 699,0 m.

Water depth66,0 m
Total depth5 699,0 m MD
Vertical depth4 226,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table56,0 m
Formation at total depth-
RigGyda
Spud23.07.1993
Completed20.11.1993
OperatorBP Norway Limited U.A.
Position56,9048 N, 3,0851 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Gyda gradient37,0 °C/km
Estimated at total depth from the gradient156 °C

The gradient is the median of 6 released wells in Gyda with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/1-A-30 A same well0,05 747,0--1993
2/1-A-290,06 211,0--1997
2/1-A-260,04 172,0--1992
2/1-A-310,05 074,0--1993
2/1-A-31 A0,06 705,0--2005
2/1-A-250,05 370,0--1996
2/1-A-25 A0,07 115,0--2011
2/1-A-270,04 820,0--1992

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗