Development, productionPluggedOil

Drilled by BP Norway Limited U.A. with Gyda in Gyda, 22.01.1996 to 04.03.1996 (42 days), to 5 370,0 m.

Water depth66,0 m
Total depth5 370,0 m MD
Vertical depth3 967,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table56,0 m
Formation at total depth-
RigGyda
Spud22.01.1996
Completed04.03.1996
OperatorBP Norway Limited U.A.
Position56,9048 N, 3,0851 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Gyda gradient37,0 °C/km
Estimated at total depth from the gradient146 °C

The gradient is the median of 6 released wells in Gyda with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/1-A-25 A same well0,07 115,0--2011
2/1-A-260,04 172,0--1992
2/1-A-290,06 211,0--1997
2/1-A-210,08 417,0--1997
2/1-A-300,05 699,0--1993
2/1-A-30 A0,05 747,0--1993
2/1-14 S0,06 130,0-1,662008
2/1-A-220,04 441,0--1991

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗