WellplannerNorwegian shelf well data

Fields / Valhall / 2/11-1

2/11-1

Exploration, appraisalPlugged and abandonedOil

Drilled by Amoco Norway Oil Company with Orion in Valhall, 14.07.1969 to 03.10.1969 (81 days), to 4 691,0 m in the Haugesund Formation.

Water depth68,0 m
Total depth4 691,0 m MD
Vertical depth-
Bottom-hole temperature133 °C
Max inclination11,0°
Rotary table27,0 m
Formation at total depthHaugesund Formation
RigOrion
Spud14.07.1969
Completed03.10.1969
OperatorAmoco Norway Oil Company
Position56,2381 N, 3,4520 E

Formations

20 tops reported, measured depth in metres.

GroupsNordland Group, top 95,0 mNordland GpHordaland Group, top 1 136,0 mHordaland GpRogaland Group, top 2 590,0 mShetland Group, top 2 635,0 mShetland GpCromer Knoll Group, top 2 887,0 mCromer Knoll GpTyne Group, top 3 555,0 mTyne GpFormationsBalder Formation, top 2 590,0 mSele Formation, top 2 600,0 mLista Formation, top 2 610,0 mTor Formation, top 2 635,0 mHod Formation, top 2 662,0 mHod FmBlodøks Formation, top 2 860,0 mHidra Formation, top 2 863,0 mRødby Formation, top 2 887,0 mSola Formation, top 2 910,0 mTuxen Formation, top 2 988,0 mÅsgard Formation, top 3 063,0 mÅsgard FmMandal Formation, top 3 555,0 mMandal FmFarsund Formation, top 3 728,0 mFarsund FmHaugesund Formation, top 4 075,0 mHaugesund Fm951 0002 0003 0004 0004 691

Temperature

Reported at total depth133 °C
Valhall gradient29,1 °C/km
Estimated at total depth from the gradient138 °C

The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/11-S-4 Y11,55 341,0--2005
2/11-S-4 Y1F21,55 341,0--2005
2/11-S-4 Y21,55 950,0--2006
2/11-S-4 Y2F21,55 950,0--2006
2/11-S-8 Y11,55 256,0--2006
2/11-S-8 Y21,55 610,0--2006
2/11-S-121,55 400,0--2003
2/11-S-161,54 065,0--2019

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"131,036"139,0-
Surface casing20"365,026"383,0-
Intermediate13 3/8"1 720,017 1/2"1 736,0-
Intermediate9 5/8"3 443,012 1/4"3 450,0-
Open hole-4 693,08 1/2"4 693,0-

Mud weight

8 measurements, one dot each, 1,10 to 1,79 g/cm³ against measured depth, water-based.

1,11,31,51,701 0002 0003 0004 000382,0 m: 1,11 g/cm³, water-based1 280,0 m: 1,31 g/cm³, water-based1 735,0 m: 1,60 g/cm³, water-based2 004,0 m: 1,65 g/cm³, water-based2 914,0 m: 1,67 g/cm³, water-based3 374,0 m: 1,62 g/cm³, water-based3 700,0 m: 1,79 g/cm³, water-based3 876,0 m: 1,55 g/cm³, water-based

Drill-stem tests

Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.

TestInterval, mChokePressureTemp.OilGas
22 595,0 - 2 605,0-----
32 629,0 - 2 651,0-----
12 633,0 - 2 639,0-----
42 646,0 - 2 651,012,5--72-
Show on the mapOpen on FactPages ↗