WellplannerNorwegian shelf well data

Fields / Valhall / 2/11-S-8 Y1

2/11-S-8 Y1

Development, productionClosedOil

Drilled by BP Norge AS with West Epsilon in Valhall, 27.02.2006 to 06.04.2006 (38 days), to 5 256,0 m.

Water depth66,7 m
Total depth5 256,0 m MD
Vertical depth2 784,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table59,2 m
Formation at total depth-
RigWest Epsilon
Spud27.02.2006
Completed06.04.2006
OperatorBP Norge AS
Position56,2277 N, 3,4375 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Valhall gradient29,1 °C/km
Estimated at total depth from the gradient81 °C

The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/11-S-8 Y2 same well0,05 610,0--2006
2/11-S-4 Y10,05 341,0--2005
2/11-S-4 Y1F20,05 341,0--2005
2/11-S-4 Y20,05 950,0--2006
2/11-S-4 Y2F20,05 950,0--2006
2/11-S-120,05 400,0--2003
2/11-S-70,06 070,0--2005
2/11-S-7 F20,06 070,0--2005

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗