2/11-S-7 F2
Development, productionProducingOil
Drilled by BP Norge AS with West Epsilon in Hod, 05.05.2005 to 07.06.2005 (33 days), to 6 070,0 m.
Water depth66,7 m
Total depth6 070,0 m MD
Vertical depth2 793,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table59,2 m
Formation at total depth-
RigWest Epsilon
Spud05.05.2005
Completed07.06.2005
OperatorBP Norge AS
Position56,2277 N, 3,4374 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Hod gradient | 35,4 °C/km |
| Estimated at total depth from the gradient | 98 °C |
The gradient is the median of 6 released wells in Hod with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/11-S-7 same well | 0,0 | 6 070,0 | - | - | 2005 |
| 2/11-S-8 Y1 | 0,0 | 5 256,0 | - | - | 2006 |
| 2/11-S-8 Y2 | 0,0 | 5 610,0 | - | - | 2006 |
| 2/11-S-11 | 0,0 | 3 060,0 | - | - | 2003 |
| 2/11-S-11 A | 0,0 | 4 849,0 | - | - | 2003 |
| 2/11-S-6 | 0,0 | 487,0 | - | - | 2002 |
| 2/11-S-6 A | 0,0 | 5 073,0 | - | - | 2019 |
| 2/11-S-3 | 0,0 | 5 898,0 | - | - | 2005 |
Casing and formation tests
No casing programme is reported for this wellbore.