2/11-S-6 A
Development, productionProducingOil
Drilled by Aker BP ASA with Maersk Invincible in Valhall, 31.01.2019 to 26.05.2019 (115 days), to 5 073,0 m.
Water depth66,7 m
Total depth5 073,0 m MD
Vertical depth2 584,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table67,6 m
Formation at total depth-
RigMaersk Invincible
Spud31.01.2019
Completed26.05.2019
OperatorAker BP ASA
Position56,2277 N, 3,4374 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Valhall gradient | 29,1 °C/km |
| Estimated at total depth from the gradient | 75 °C |
The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/11-S-6 same well | 0,0 | 487,0 | - | - | 2002 |
| 2/11-S-10 | 0,0 | 5 220,0 | - | - | 2004 |
| 2/11-S-7 | 0,0 | 6 070,0 | - | - | 2005 |
| 2/11-S-7 F2 | 0,0 | 6 070,0 | - | - | 2005 |
| 2/11-S-2 | 0,0 | 7 301,0 | - | - | 2005 |
| 2/11-S-5 | 0,0 | 5 580,0 | - | - | 2005 |
| 2/11-S-9 | 0,0 | 498,0 | - | - | 2014 |
| 2/11-S-9 A | 0,0 | 5 788,0 | - | - | 2014 |
Casing and formation tests
No casing programme is reported for this wellbore.