2/11-B-11
Development, productionPredrilled
Drilled by Aker BP ASA with Maersk Invincible in Hod.
Water depth73,0 m
Total depth-
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table72,3 m
Formation at total depth-
RigMaersk Invincible
Spud-
Completed-
OperatorAker BP ASA
Position56,1808 N, 3,4655 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Hod gradient | 35,4 °C/km |
The gradient is the median of 6 released wells in Hod with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/11-B-12 | 0,0 | - | - | - | - |
| 2/11-B-8 | 0,0 | 5 346,0 | - | - | 2021 |
| 2/11-B-10 | 0,0 | - | - | - | - |
| 2/11-B-9 | 0,0 | 5 303,0 | - | - | 2022 |
| 2/11-B-9 Y2 | 0,0 | 4 590,0 | - | - | 2022 |
| 2/11-B-7 | 0,0 | - | - | - | - |
| 2/11-B-5 | 0,0 | 4 064,0 | - | - | 2021 |
| 2/11-B-5 A | 0,0 | 3 600,0 | - | - | 2021 |
Casing and formation tests
No casing programme is reported for this wellbore.