2/11-B-9 Y2
Development, productionProducingOil
Drilled by Aker BP ASA with Maersk Invincible in Hod, 05.03.2022 to 12.03.2022 (7 days), to 4 590,0 m.
Water depth73,0 m
Total depth4 590,0 m MD
Vertical depth2 886,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table72,1 m
Formation at total depth-
RigMaersk Invincible
Spud05.03.2022
Completed12.03.2022
OperatorAker BP ASA
Position56,1808 N, 3,4654 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Hod gradient | 35,4 °C/km |
| Estimated at total depth from the gradient | 101 °C |
The gradient is the median of 6 released wells in Hod with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.