WellplannerNorwegian shelf well data

Fields / Hod / 2/11-B-3

2/11-B-3

Development, productionProducingOil

Drilled by Aker BP ASA with Maersk Invincible in Hod, 12.12.2021 to 24.12.2021 (12 days), to 4 777,0 m.

Water depth73,0 m
Total depth4 777,0 m MD
Vertical depth2 742,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table72,3 m
Formation at total depth-
RigMaersk Invincible
Spud12.12.2021
Completed24.12.2021
OperatorAker BP ASA
Position56,1808 N, 3,4653 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Hod gradient35,4 °C/km
Estimated at total depth from the gradient96 °C

The gradient is the median of 6 released wells in Hod with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/11-B-60,05 640,0--2021
2/11-B-20,05 683,0--2022
2/11-B-50,04 064,0--2021
2/11-B-5 A0,03 600,0--2021
2/11-B-90,05 303,0--2022
2/11-B-9 Y20,04 590,0--2022
2/11-B-10,0----
2/11-B-80,05 346,0--2021

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗