WellplannerNorwegian shelf well data

Fields / Hod / 2/11-B-2

2/11-B-2

Development, productionProducingOil

Drilled by Aker BP ASA with Maersk Invincible in Hod, 05.01.2022 to 10.02.2022 (36 days), to 5 683,0 m.

Water depth73,0 m
Total depth5 683,0 m MD
Vertical depth2 802,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table72,3 m
Formation at total depth-
RigMaersk Invincible
Spud05.01.2022
Completed10.02.2022
OperatorAker BP ASA
Position56,1807 N, 3,4654 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Hod gradient35,4 °C/km
Estimated at total depth from the gradient98 °C

The gradient is the median of 6 released wells in Hod with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/11-B-10,0----
2/11-B-30,04 777,0--2021
2/11-B-50,04 064,0--2021
2/11-B-5 A0,03 600,0--2021
2/11-B-40,0----
2/11-B-60,05 640,0--2021
2/11-B-80,05 346,0--2021
2/11-B-90,05 303,0--2022

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗