2/11-U-1
Other, soil drillingPlugged and abandoned
Drilled by BP Norge AS with Bucentaur in Hod, 09.06.2012 to 09.06.2012 (0 days), to 108,5 m.
Water depth71,5 m
Total depth108,5 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table-
Formation at total depth-
RigBucentaur
Spud09.06.2012
Completed09.06.2012
OperatorBP Norge AS
Position56,1928 N, 3,4693 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Hod gradient | 35,4 °C/km |
| Estimated at total depth from the gradient | 5 °C |
The gradient is the median of 6 released wells in Hod with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.