WellplannerNorwegian shelf well data

Fields / Hod / 2/11-U-1

2/11-U-1

Other, soil drillingPlugged and abandoned

Drilled by BP Norge AS with Bucentaur in Hod, 09.06.2012 to 09.06.2012 (0 days), to 108,5 m.

Water depth71,5 m
Total depth108,5 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table-
Formation at total depth-
RigBucentaur
Spud09.06.2012
Completed09.06.2012
OperatorBP Norge AS
Position56,1928 N, 3,4693 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Hod gradient35,4 °C/km
Estimated at total depth from the gradient5 °C

The gradient is the median of 6 released wells in Hod with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/11-U-30,1108,2--2012
2/11-U-20,1107,6--2012
2/11-U-140,1113,5--2012
2/11-U-100,184,0--2012
2/11-U-110,199,0--2012
2/11-U-130,2109,0--2012
2/11-U-120,2110,0--2012
2/11-U-40,2169,0--2012

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗