WellplannerNorwegian shelf well data

Fields / 2/2-1

2/2-1

Exploration, wildcatPlugged and abandonedOil and gas

Drilled by Saga Petroleum ASA with Dyvi Alpha, 09.04.1982 to 03.07.1982 (85 days), to 4 003,0 m in the Zechstein Group.

Water depth59,0 m
Total depth4 003,0 m MD
Vertical depth4 002,0 m TVD
Bottom-hole temperature146 °C
Max inclination3,2°
Rotary table25,0 m
Formation at total depthZechstein Group
RigDyvi Alpha
Spud09.04.1982
Completed03.07.1982
OperatorSaga Petroleum ASA
Position56,7877 N, 3,6377 E

Formations

22 tops reported, measured depth in metres.

GroupsNordland Group, top 84,0 mNordland GpHordaland Group, top 1 600,0 mHordaland GpRogaland Group, top 2 658,0 mRogaland GpShetland Group, top 2 815,0 mShetland GpCromer Knoll Group, top 3 225,0 mTyne Group, top 3 314,0 mVestland Group, top 3 357,0 mVestland GpNo Group Defined, top 3 820,0 mZechstein Group, top 3 947,0 mFormationsVade Formation, top 2 100,0 mNo Formal Name, top 2 172,0 mNo Formal NameBalder Formation, top 2 658,0 mSele Formation, top 2 678,0 mLista Formation, top 2 730,0 mMaureen Formation, top 2 781,0 mTor Formation, top 2 815,0 mTor FmHod Formation, top 3 128,0 mHod FmMandal Formation, top 3 314,0 mFarsund Formation, top 3 322,0 mUla Formation, top 3 357,0 mUla FmBryne Formation, top 3 752,0 mSkagerrak Formation, top 3 820,0 mSkagerrak Fm841 0002 0003 0004 0004 003

Temperature

Reported at total depth146 °C
Drill-stem test at 3 730,0 m136 °C

The wellbore is not in a field, so no field gradient applies.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/2-41,54 020,0138 °C1,521988
2/5-128,14 153,0130 °C2,002001
2/3-410,43 386,0109 °C1,561984
2/6-U-1910,5----
2/6-U-1810,6----
2/6-U-1710,7----
2/6-U-2211,3----
2/6-U-2111,3----

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"207,036"207,0-
Surface casing20"655,026"665,01,57 LOT
Intermediate13 3/8"1 707,017 1/2"1 715,01,80 LOT
Intermediate9 5/8"3 243,012 1/4"3 260,01,87 LOT
Liner7"4 003,08 1/2"4 003,0-

Drill-stem tests

Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.

TestInterval, mChokePressureTemp.OilGas
13 715,0 - 3 730,011,151,0136200-
Show on the mapOpen on FactPages ↗