WellplannerNorwegian shelf well data

Fields / Ekofisk / 2/4-B-17 B

2/4-B-17 B

Development, productionJunked

Drilled by Phillips Petroleum Company Norway with Mærsk Giant in Ekofisk, 18.10.2001 to 13.10.2002 (360 days), to 2 408,0 m.

Water depth73,2 m
Total depth2 408,0 m MD
Vertical depth2 122,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table51,5 m
Formation at total depth-
RigMærsk Giant
Spud18.10.2001
Completed13.10.2002
OperatorPhillips Petroleum Company Norway
Position56,5653 N, 3,2039 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Ekofisk gradient38,0 °C/km
Estimated at total depth from the gradient80 °C

The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/4-B-17 same well0,03 997,1--1974
2/4-B-17 A same well0,03 926,0--1990
2/4-B-17 C same well0,04 657,0--2003
2/4-B-180,03 485,4--1974
2/4-B-18 A0,03 499,1--1986
2/4-B-18 B0,03 491,0--1994
2/4-B-18 C0,04 476,0--2003
2/4-B-18 D0,05 808,0--2011

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗