2/4-B-17
Development, productionPluggedOil
Drilled by Phillips Petroleum Company Norway with Ekofisk B in Ekofisk, 19.01.1974 to 26.06.1974 (158 days), to 3 997,1 m.
Water depth71,0 m
Total depth3 997,1 m MD
Vertical depth3 331,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table33,0 m
Formation at total depth-
RigEkofisk B
Spud19.01.1974
Completed26.06.1974
OperatorPhillips Petroleum Company Norway
Position56,5653 N, 3,2039 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 127 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-B-17 A same well | 0,0 | 3 926,0 | - | - | 1990 |
| 2/4-B-17 B same well | 0,0 | 2 408,0 | - | - | 2001 |
| 2/4-B-17 C same well | 0,0 | 4 657,0 | - | - | 2003 |
| 2/4-B-18 | 0,0 | 3 485,4 | - | - | 1974 |
| 2/4-B-18 A | 0,0 | 3 499,1 | - | - | 1986 |
| 2/4-B-18 B | 0,0 | 3 491,0 | - | - | 1994 |
| 2/4-B-18 C | 0,0 | 4 476,0 | - | - | 2003 |
| 2/4-B-18 D | 0,0 | 5 808,0 | - | - | 2011 |
Casing and formation tests
No casing programme is reported for this wellbore.