2/4-C-1
Development, productionPluggedOil
Drilled by Phillips Petroleum Company Norway with Ekofisk C in Ekofisk, 13.07.1975 to 15.09.1975 (64 days), to 3 893,8 m.
Water depth73,0 m
Total depth3 893,8 m MD
Vertical depth3 289,5 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table37,0 m
Formation at total depth-
RigEkofisk C
Spud13.07.1975
Completed15.09.1975
OperatorPhillips Petroleum Company Norway
Position56,5480 N, 3,2154 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 125 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.