2/4-C-6 A
Development, productionPluggedOil
Drilled by Phillips Petroleum Company Norway with Ekofisk C in Ekofisk, 22.12.1988 to 29.01.1989 (38 days), to 3 645,1 m.
Water depth73,0 m
Total depth3 645,1 m MD
Vertical depth3 325,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table37,0 m
Formation at total depth-
RigEkofisk C
Spud22.12.1988
Completed29.01.1989
OperatorPhillips Petroleum Company Norway
Position56,5480 N, 3,2155 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 126 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.