Fields / Vest Ekofisk / 2/4-D-14
2/4-D-14
Development, productionPlugged and abandonedGas
Drilled by Phillips Petroleum Company Norway with Vest Ekofisk in Vest Ekofisk, 28.06.1976 to 01.09.1976 (65 days), to 3 539,0 m.
Water depth71,0 m
Total depth3 539,0 m MD
Vertical depth3 381,3 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table34,0 m
Formation at total depth-
RigVest Ekofisk
Spud28.06.1976
Completed01.09.1976
OperatorPhillips Petroleum Company Norway
Position56,5631 N, 3,0856 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
1 released well in Vest Ekofisk report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-D-9 | 0,0 | 3 844,1 | - | - | 1975 |
| 2/4-D-15 | 0,0 | 3 445,2 | - | - | 1988 |
| 2/4-D-15 A | 0,0 | 3 477,0 | - | - | 1993 |
| 2/4-D-13 | 0,0 | 3 461,0 | - | - | 1977 |
| 2/4-D-13 A | 0,0 | 3 445,0 | - | - | 1992 |
| 2/4-D-8 | 0,0 | 4 241,3 | - | - | 1975 |
| 2/4-D-8 A | 0,0 | 3 410,0 | - | - | 1988 |
| 2/4-D-10 | 0,0 | 3 627,7 | - | - | 1976 |
Casing and formation tests
No casing programme is reported for this wellbore.