Fields / Vest Ekofisk / 2/4-D-15 A
2/4-D-15 A
Development, productionPlugged and abandonedGas
Drilled by Phillips Petroleum Company Norway with Vest Ekofisk in Vest Ekofisk, 26.04.1993 to 21.05.1993 (25 days), to 3 477,0 m.
Water depth71,0 m
Total depth3 477,0 m MD
Vertical depth3 382,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table34,0 m
Formation at total depth-
RigVest Ekofisk
Spud26.04.1993
Completed21.05.1993
OperatorPhillips Petroleum Company Norway
Position56,5631 N, 3,0856 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
1 released well in Vest Ekofisk report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.