2/4-K-14
Development, injectionInjectingWater
Drilled by Phillips Petroleum Company Norway with Ekofisk K in Ekofisk, 19.04.1995 to 19.10.1995 (183 days), to 5 249,0 m.
Water depth74,0 m
Total depth5 249,0 m MD
Vertical depth3 367,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table55,0 m
Formation at total depth-
RigEkofisk K
Spud19.04.1995
Completed19.10.1995
OperatorPhillips Petroleum Company Norway
Position56,5656 N, 3,2064 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 127 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-K-14 A same well | 0,0 | - | - | - | - |
| 2/4-K-13 | 0,0 | 3 355,0 | - | - | 1984 |
| 2/4-K-13 A | 0,0 | 3 944,0 | - | - | 2013 |
| 2/4-K-4 | 0,0 | 4 017,0 | - | - | 1984 |
| 2/4-K-4 A | 0,0 | 4 159,0 | - | - | 2014 |
| 2/4-K-24 | 0,0 | 3 867,0 | - | - | 1988 |
| 2/4-K-24 A | 0,0 | 4 851,0 | - | - | 2022 |
| 2/4-K-15 | 0,0 | 4 530,9 | - | - | 1990 |
Casing and formation tests
No casing programme is reported for this wellbore.