2/4-K-24
Development, injectionPluggedWater
Drilled by Phillips Petroleum Company Norway with Ekofisk K in Ekofisk, 03.08.1988 to 12.01.1989 (162 days), to 3 867,0 m.
Water depth71,0 m
Total depth3 867,0 m MD
Vertical depth3 367,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table57,0 m
Formation at total depth-
RigEkofisk K
Spud03.08.1988
Completed12.01.1989
OperatorPhillips Petroleum Company Norway
Position56,5656 N, 3,2064 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 127 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-K-24 A same well | 0,0 | 4 851,0 | - | - | 2022 |
| 2/4-K-23 | 0,0 | 3 395,8 | - | - | 1986 |
| 2/4-K-23 A | 0,0 | 4 617,0 | - | - | 2020 |
| 2/4-K-14 | 0,0 | 5 249,0 | - | - | 1995 |
| 2/4-K-14 A | 0,0 | - | - | - | - |
| 2/4-K-25 | 0,0 | 5 158,0 | - | - | 1992 |
| 2/4-K-25 AY1 | 0,0 | 5 537,0 | - | - | 2019 |
| 2/4-K-25 AY2 | 0,0 | 5 852,0 | - | - | 2019 |
Casing and formation tests
No casing programme is reported for this wellbore.