WellplannerNorwegian shelf well data

Fields / Ekofisk / 2/4-K-26 B

2/4-K-26 B

Development, injectionInjectingWater

Drilled by ConocoPhillips Skandinavia AS with Ekofisk K in Ekofisk, 02.03.2022 to 11.07.2022 (131 days), to 4 852,0 m.

Water depth73,8 m
Total depth4 852,0 m MD
Vertical depth3 231,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table55,2 m
Formation at total depth-
RigEkofisk K
Spud02.03.2022
Completed11.07.2022
OperatorConocoPhillips Skandinavia AS
Position56,5656 N, 3,2063 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Ekofisk gradient38,0 °C/km
Estimated at total depth from the gradient122 °C

The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/4-K-26 same well0,03 797,8--1989
2/4-K-26 A same well0,03 901,0--2006
2/4-K-250,05 158,0--1992
2/4-K-25 AY10,05 537,0--2019
2/4-K-25 AY20,05 852,0--2019
2/4-K-160,05 220,0--1990
2/4-K-16 A0,04 161,0--2021
2/4-K-270,04 305,9--1988

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗