2/4-K-26
Development, injectionPluggedWater
Drilled by Phillips Petroleum Company Norway with Ekofisk K in Ekofisk, 29.12.1989 to 11.02.1990 (44 days), to 3 797,8 m.
Water depth71,0 m
Total depth3 797,8 m MD
Vertical depth3 368,3 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table57,0 m
Formation at total depth-
RigEkofisk K
Spud29.12.1989
Completed11.02.1990
OperatorPhillips Petroleum Company Norway
Position56,5656 N, 3,2063 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 127 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-K-26 A same well | 0,0 | 3 901,0 | - | - | 2006 |
| 2/4-K-26 B same well | 0,0 | 4 852,0 | - | - | 2022 |
| 2/4-K-25 | 0,0 | 5 158,0 | - | - | 1992 |
| 2/4-K-25 AY1 | 0,0 | 5 537,0 | - | - | 2019 |
| 2/4-K-25 AY2 | 0,0 | 5 852,0 | - | - | 2019 |
| 2/4-K-16 | 0,0 | 5 220,0 | - | - | 1990 |
| 2/4-K-16 A | 0,0 | 4 161,0 | - | - | 2021 |
| 2/4-K-27 | 0,0 | 4 305,9 | - | - | 1988 |
Casing and formation tests
No casing programme is reported for this wellbore.