Fields / 2/4-U-50
2/4-U-50
Other, soil drillingPlugged and abandoned
Drilled by Phillips Petroleum Company Norway with Bucentaur, 01.07.2001 to 01.07.2001 (0 days), to 104,0 m.
Water depth75,0 m
Total depth104,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table2,9 m
Formation at total depth-
RigBucentaur
Spud01.07.2001
Completed01.07.2001
OperatorPhillips Petroleum Company Norway
Position56,5644 N, 3,2021 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-B-8 | 0,1 | 3 353,0 | - | - | 1979 |
| 2/4-B-8 A | 0,1 | 5 621,0 | - | - | 2007 |
| 2/4-B-16 | 0,1 | 3 307,0 | - | - | 1980 |
| 2/4-B-16 A | 0,1 | 3 180,6 | - | - | 1986 |
| 2/4-B-16 B | 0,1 | 3 338,0 | - | - | 1991 |
| 2/4-B-16 C | 0,1 | 3 562,0 | - | - | 1991 |
| 2/4-B-16 D | 0,1 | 3 969,0 | - | - | 2007 |
| 2/4-B-24 | 0,1 | 3 295,5 | - | - | 1979 |
Casing and formation tests
No casing programme is reported for this wellbore.