2/4-VC-4 H
Development, injectionInjectingWater
Drilled by ConocoPhillips Skandinavia AS with West Elara in Ekofisk, 23.07.2018 to 19.08.2018 (27 days), to 4 691,0 m.
Water depth74,5 m
Total depth4 691,0 m MD
Vertical depth3 329,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table55,1 m
Formation at total depth-
RigWest Elara
Spud23.07.2018
Completed19.08.2018
OperatorConocoPhillips Skandinavia AS
Position56,5223 N, 3,2447 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 126 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-VC-2 H | 0,0 | 5 019,0 | - | - | 2018 |
| 2/4-VC-2 Y2H | 0,0 | 5 347,0 | - | - | 2018 |
| 2/4-VC-2 Y3H | 0,0 | 5 468,0 | - | - | 2018 |
| 2/4-VC-3 H | 0,0 | 4 652,0 | - | - | 2018 |
| 2/4-VC-1 H | 0,0 | 4 659,0 | - | - | 2018 |
| 2/4-U-59 | 0,0 | 11,7 | - | - | 2017 |
| 2/4-U-60 | 0,0 | 109,4 | - | - | 2017 |
| 2/4-U-58 | 0,1 | 123,2 | - | - | 2017 |
Casing and formation tests
No casing programme is reported for this wellbore.