WellplannerNorwegian shelf well data

Fields / 2/4-U-58

2/4-U-58

Other, soil drillingPlugged and abandoned

Drilled by ConocoPhillips Skandinavia AS with Bucentaur, 13.10.2017 to 13.10.2017 (0 days), to 123,2 m.

Water depth73,8 m
Total depth123,2 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table4,2 m
Formation at total depth-
RigBucentaur
Spud13.10.2017
Completed13.10.2017
OperatorConocoPhillips Skandinavia AS
Position56,5218 N, 3,2435 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-

The wellbore is not in a field, so no field gradient applies.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/4-U-600,1109,4--2017
2/4-U-590,111,7--2017
2/4-U-610,1115,0--2017
2/4-VC-4 H0,14 691,0--2018
2/4-VC-3 H0,14 652,0--2018
2/4-VC-1 H0,14 659,0--2018
2/4-VC-2 H0,15 019,0--2018
2/4-VC-2 Y2H0,15 347,0--2018

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗