Fields / 2/4-U-61
2/4-U-61
Other, soil drillingPlugged and abandoned
Drilled by ConocoPhillips Skandinavia AS with Bucentaur, 14.10.2017 to 14.10.2017 (0 days), to 115,0 m.
Water depth73,9 m
Total depth115,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table4,2 m
Formation at total depth-
RigBucentaur
Spud14.10.2017
Completed14.10.2017
OperatorConocoPhillips Skandinavia AS
Position56,5214 N, 3,2424 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-U-58 | 0,1 | 123,2 | - | - | 2017 |
| 2/4-U-60 | 0,1 | 109,4 | - | - | 2017 |
| 2/4-U-59 | 0,1 | 11,7 | - | - | 2017 |
| 2/4-VC-4 H | 0,2 | 4 691,0 | - | - | 2018 |
| 2/4-VC-3 H | 0,2 | 4 652,0 | - | - | 2018 |
| 2/4-VC-1 H | 0,2 | 4 659,0 | - | - | 2018 |
| 2/4-VC-2 H | 0,2 | 5 019,0 | - | - | 2018 |
| 2/4-VC-2 Y2H | 0,2 | 5 347,0 | - | - | 2018 |
Casing and formation tests
No casing programme is reported for this wellbore.