2/4-X-10
Development, productionPluggedOil
Drilled by Phillips Petroleum Company Norway with Mærsk Gallant in Ekofisk, 16.12.1997 to 26.01.1998 (41 days), to 4 471,0 m.
Water depth76,0 m
Total depth4 471,0 m MD
Vertical depth3 260,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table66,0 m
Formation at total depth-
RigMærsk Gallant
Spud16.12.1997
Completed26.01.1998
OperatorPhillips Petroleum Company Norway
Position56,5476 N, 3,2189 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 123 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-X-10 A same well | 0,0 | 6 211,2 | - | - | 2023 |
| 2/4-X-25 | 0,0 | 4 394,0 | - | - | 2004 |
| 2/4-X-25 A | 0,0 | 5 578,0 | - | - | 2020 |
| 2/4-X-26 | 0,0 | 3 551,0 | - | - | 2006 |
| 2/4-X-21 A | 0,0 | 5 318,8 | - | - | 2024 |
| 2/4-X-21 Y1 | 0,0 | 5 720,0 | - | - | 2004 |
| 2/4-X-21 Y2 | 0,0 | 5 413,0 | - | - | 2004 |
| 2/4-X-27 | 0,0 | 5 224,0 | - | - | 1998 |
Casing and formation tests
No casing programme is reported for this wellbore.