2/4-X-32
Development, productionProducingOil
Drilled by Phillips Petroleum Company Norway with Ekofisk X in Ekofisk, 19.02.2001 to 04.04.2001 (44 days), to 3 512,0 m.
Water depth75,0 m
Total depth3 512,0 m MD
Vertical depth3 395,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table57,0 m
Formation at total depth-
RigEkofisk X
Spud19.02.2001
Completed04.04.2001
OperatorPhillips Petroleum Company Norway
Position56,5477 N, 3,2190 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 128 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-X-31 | 0,0 | 4 341,6 | - | - | 1997 |
| 2/4-X-31 AY1 | 0,0 | 5 464,0 | - | - | 2020 |
| 2/4-X-31 AY2 | 0,0 | - | - | - | - |
| 2/4-X-33 | 0,0 | 3 539,0 | - | - | 2000 |
| 2/4-X-33 A | 0,0 | 3 678,0 | - | - | 2014 |
| 2/4-X-36 | 0,0 | 3 399,1 | - | - | 1998 |
| 2/4-X-36 A | 0,0 | 4 872,0 | - | - | 2015 |
| 2/4-X-36 B | 0,0 | - | - | - | - |
Casing and formation tests
No casing programme is reported for this wellbore.