2/4-X-36
Development, productionPluggedOil
Drilled by Phillips Petroleum Company Norway with Ekofisk X in Ekofisk, 06.01.1998 to 08.02.1998 (33 days), to 3 399,1 m.
Water depth75,9 m
Total depth3 399,1 m MD
Vertical depth3 244,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table57,3 m
Formation at total depth-
RigEkofisk X
Spud06.01.1998
Completed08.02.1998
OperatorPhillips Petroleum Company Norway
Position56,5477 N, 3,2190 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 122 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-X-36 A same well | 0,0 | 4 872,0 | - | - | 2015 |
| 2/4-X-36 B same well | 0,0 | - | - | - | - |
| 2/4-X-40 | 0,0 | 4 110,2 | - | - | 1998 |
| 2/4-X-40 A | 0,0 | 3 901,0 | - | - | 2007 |
| 2/4-X-40 B | 0,0 | 5 822,0 | - | - | 2022 |
| 2/4-X-37 | 0,0 | 3 466,0 | - | - | 2001 |
| 2/4-X-37 A | 0,0 | 3 909,0 | - | - | 2024 |
| 2/4-X-32 | 0,0 | 3 512,0 | - | - | 2001 |
Casing and formation tests
No casing programme is reported for this wellbore.