2/4-X-35
Development, productionPluggedOil
Drilled by Phillips Petroleum Company Norway with Ekofisk X in Ekofisk, 20.03.1997 to 24.04.1997 (35 days), to 3 881,3 m.
Water depth76,2 m
Total depth3 881,3 m MD
Vertical depth3 343,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table57,3 m
Formation at total depth-
RigEkofisk X
Spud20.03.1997
Completed24.04.1997
OperatorPhillips Petroleum Company Norway
Position56,5477 N, 3,2190 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 126 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-X-35 A same well | 0,0 | 4 842,0 | - | - | 2009 |
| 2/4-X-35 B same well | 0,0 | 5 861,0 | - | - | 2023 |
| 2/4-X-39 | 0,0 | 5 371,0 | - | - | 1998 |
| 2/4-X-39 A | 0,0 | 5 671,0 | - | - | 2018 |
| 2/4-X-39 B | 0,0 | 5 124,0 | - | - | 2018 |
| 2/4-X-36 | 0,0 | 3 399,1 | - | - | 1998 |
| 2/4-X-36 A | 0,0 | 4 872,0 | - | - | 2015 |
| 2/4-X-36 B | 0,0 | - | - | - | - |
Casing and formation tests
No casing programme is reported for this wellbore.