WellplannerNorwegian shelf well data

Fields / Eldfisk / 2/7-1

2/7-1

Exploration, wildcatPlugged and abandonedOil

Drilled by Phillips Petroleum Company Norway with Ocean Viking in Eldfisk, 03.08.1970 to 11.12.1970 (130 days), to 4 572,0 m in the Vestland Group.

Water depth71,0 m
Total depth4 572,0 m MD
Vertical depth-
Bottom-hole temperature160 °C
Max inclination8,6°
Rotary table27,0 m
Formation at total depthVestland Group
RigOcean Viking
Spud03.08.1970
Completed11.12.1970
OperatorPhillips Petroleum Company Norway
Position56,4291 N, 3,2039 E

Formations

19 tops reported, measured depth in metres.

GroupsNordland Group, top 98,0 mNordland GpHordaland Group, top 1 681,0 mHordaland GpRogaland Group, top 2 820,0 mShetland Group, top 2 934,0 mShetland GpCromer Knoll Group, top 3 423,0 mCromer Knoll GpTyne Group, top 3 707,0 mTyne GpVestland Group, top 4 258,0 mVestland GpFormationsBalder Formation, top 2 820,0 mSele Formation, top 2 831,0 mLista Formation, top 2 873,0 mVåle Formation, top 2 918,0 mEkofisk Formation, top 2 934,0 mTor Formation, top 3 014,0 mHod Formation, top 3 047,0 mHod FmBlodøks Formation, top 3 292,0 mHidra Formation, top 3 303,0 mRødby Formation, top 3 423,0 mRødby FmMandal Formation, top 3 707,0 mFarsund Formation, top 3 730,0 mFarsund Fm981 0002 0003 0004 0004 572

Temperature

Reported at total depth160 °C
Eldfisk gradient34,0 °C/km
Estimated at total depth from the gradient156 °C

The gradient is the median of 7 released wells in Eldfisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/7-NC-4 H0,65 171,8--2024
2/7-NC-5 H0,65 181,6--2024
2/7-NC-3 H0,64 683,9--2025
2/7-NC-2 H0,64 846,3--2024
2/7-NC-1 AH0,64 501,6--2024
2/7-NC-1 BH0,65 946,7--2024
2/7-NC-1 H0,65 077,0--2024
2/7-NA-4 Y1H0,75 312,6--2024

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"136,036"136,0-
Surface casing20"579,026"588,0-
Intermediate13 3/8"1 592,017 1/2"1 601,0-
Intermediate9 5/8"3 088,012 1/4"3 106,0-
Liner7"4 267,08 1/2"4 268,0-

Mud weight

8 measurements, one dot each, 1,10 to 1,93 g/cm³ against measured depth, seawater, waterbased.

1,11,31,51,71,901 0002 0003 0004 000365,0 m: 1,10 g/cm³, seawater609,0 m: 1,56 g/cm³, waterbased2 743,0 m: 1,71 g/cm³, waterbased3 200,0 m: 1,71 g/cm³, waterbased3 657,0 m: 1,76 g/cm³, waterbased3 820,0 m: 1,88 g/cm³, waterbased4 185,0 m: 1,90 g/cm³, waterbased4 572,0 m: 1,93 g/cm³, waterbased

Drill-stem tests

Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.

TestInterval, mChokePressureTemp.OilGas
12 942,0 - 2 975,0-----
Show on the mapOpen on FactPages ↗