Fields / Embla / 2/7-20
2/7-20
Exploration, wildcatSuspendedOil
Drilled by Phillips Petroleum Company Norway with Dyvi Stena in Embla, 15.10.1987 to 25.06.1988 (254 days), to 4 509,0 m in the No Group Defined.
Water depth70,8 m
Total depth4 509,0 m MD
Vertical depth4 508,0 m TVD
Bottom-hole temperature167 °C
Max inclination5,2°
Rotary table25,0 m
Formation at total depthNo Group Defined
RigDyvi Stena
Spud15.10.1987
Completed25.06.1988
OperatorPhillips Petroleum Company Norway
Position56,3332 N, 3,2483 E
Formations
18 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 167 °C |
| Embla gradient | 35,5 °C/km |
| Estimated at total depth from the gradient | 160 °C |
The gradient is the median of 7 released wells in Embla with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 2/7-20 R same well | 0,0 | 4 535,0 | - | 2,12 | 1991 |
| 2/7-D-20 | 0,0 | 4 535,0 | - | - | 1993 |
| 2/7-25 S | 0,0 | 5 177,0 | 155 °C | 2,12 | 1990 |
| 2/7-D-7 | 0,0 | 5 982,0 | - | - | 2005 |
| 2/7-21 S | 0,0 | 5 038,0 | 169 °C | 2,13 | 1989 |
| 2/7-21 SR | 0,0 | 5 045,0 | - | 2,12 | 1991 |
| 2/7-D-21 | 0,0 | 5 067,0 | - | - | 1991 |
| 2/7-27 S | 0,0 | 4 801,0 | 168 °C | 2,10 | 1991 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 172,0 | 36" | 174,0 | - |
| Surface casing | 20" | 1 069,0 | 26" | 1 074,0 | 2,03 LOT |
| Intermediate | 13 3/8" | 2 439,0 | 17 1/2" | 2 448,0 | 2,01 LOT |
| Intermediate | 9 5/8" | 3 800,0 | 12 1/4" | 3 819,0 | 2,16 LOT |
| Liner | 7" | 4 278,0 | 8 1/2" | 4 284,0 | 2,22 LOT |
| Open hole | - | 4 512,0 | 5 7/8" | 4 512,0 | - |
Mud weight
256 measurements, one dot each, 0,40 to 7,79 g/cm³ against measured depth, oil based, water based.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|
| 1 | 4 099,0 - 4 258,0 | 9,5 | - | - | 566 | 223 000 |