Fields / Embla / 2/7-21 S
2/7-21 S
Exploration, appraisalSuspendedOil
Drilled by Phillips Petroleum Company Norway with Ross Isle in Embla, 21.06.1989 to 09.01.1990 (202 days), to 5 038,0 m in the No Group Defined.
Water depth71,0 m
Total depth5 038,0 m MD
Vertical depth4 706,0 m TVD
Bottom-hole temperature169 °C
Max inclination44,9°
Rotary table22,0 m
Formation at total depthNo Group Defined
RigRoss Isle
Spud21.06.1989
Completed09.01.1990
OperatorPhillips Petroleum Company Norway
Position56,3332 N, 3,2483 E
Formations
16 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 169 °C |
| Drill-stem test at 4 610,0 m | 160 °C |
| Embla gradient | 35,5 °C/km |
| Estimated at total depth from the gradient | 168 °C |
The gradient is the median of 7 released wells in Embla with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 2/7-21 SR same well | 0,0 | 5 045,0 | - | 2,12 | 1991 |
| 2/7-D-21 | 0,0 | 5 067,0 | - | - | 1991 |
| 2/7-D-26 | 0,0 | 4 870,0 | - | - | 1991 |
| 2/7-20 | 0,0 | 4 509,0 | 167 °C | 7,79 | 1987 |
| 2/7-20 R | 0,0 | 4 535,0 | - | 2,12 | 1991 |
| 2/7-D-20 | 0,0 | 4 535,0 | - | - | 1993 |
| 2/7-D-6 | 0,0 | 4 889,0 | - | - | 1999 |
| 2/7-25 S | 0,0 | 5 177,0 | 155 °C | 2,12 | 1990 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 171,0 | 36" | 173,0 | - |
| Intermediate | 20" | 1 056,0 | 26" | 1 067,0 | 1,85 LOT |
| Intermediate | 13 3/8" | 2 512,0 | 17 1/2" | 2 523,0 | 2,08 LOT |
| Intermediate | 9 5/8" | 4 221,0 | 12 1/4" | 4 234,0 | 2,30 LOT |
| Liner | 7" | 4 557,0 | 8 1/2" | 4 563,0 | 2,22 LOT |
| Liner | 5" | 5 039,0 | 5 7/8" | 5 039,0 | - |
Mud weight
264 measurements, one dot each, 1,00 to 2,13 g/cm³ against measured depth, oil based, water based.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|
| 3.1 | 4 308,0 - 4 337,6 | 11,1 | - | 153 | 760 | 249 000 |
| 3.2 | 4 308,0 - 4 337,6 | 19,0 | - | 153 | 1 236 | 447 000 |
| 2.1 | 4 446,4 - 4 518,7 | 11,9 | - | 153 | 879 | 272 000 |
| 2.2 | 4 446,4 - 4 518,7 | 9,9 | - | - | 592 | 211 000 |
| 1 | 4 575,0 - 4 610,0 | 7,9 | - | 160 | 107 | 27 000 |