2/7-D-26
Development, productionClosedOil
Drilled by Phillips Petroleum Company Norway with Mærsk Guardian in Embla, 20.03.1991 to 13.09.1991 (177 days), to 4 870,0 m.
Water depth70,8 m
Total depth4 870,0 m MD
Vertical depth4 718,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table51,0 m
Formation at total depth-
RigMærsk Guardian
Spud20.03.1991
Completed13.09.1991
OperatorPhillips Petroleum Company Norway
Position56,3332 N, 3,2483 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Embla gradient | 35,5 °C/km |
| Estimated at total depth from the gradient | 167 °C |
The gradient is the median of 7 released wells in Embla with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.