Fields / 2/7-24
2/7-24
Exploration, wildcatPlugged and abandonedDry
Drilled by Phillips Petroleum Company Norway with Ross Isle, 07.11.1990 to 13.04.1991 (157 days), to 5 023,0 m in the Farsund Formation.
Water depth70,0 m
Total depth5 023,0 m MD
Vertical depth4 986,0 m TVD
Bottom-hole temperature130 °C
Max inclination20,0°
Rotary table22,3 m
Formation at total depthFarsund Formation
RigRoss Isle
Spud07.11.1990
Completed13.04.1991
OperatorPhillips Petroleum Company Norway
Position56,3092 N, 3,3232 E
Formations
19 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 130 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 2/8-4 | 1,8 | 2 852,0 | 86 °C | 1,77 | 1973 |
| 2/8-N-1 | 2,5 | 578,0 | - | - | 2012 |
| 2/8-N-1 A | 2,5 | 3 340,0 | - | - | 2012 |
| 2/8-N-1 B | 2,5 | 4 854,0 | - | - | 2012 |
| 2/8-N-1 C | 2,5 | 6 808,0 | - | - | 2021 |
| 2/8-N-5 | 2,5 | 5 613,0 | - | - | 2004 |
| 2/8-N-9 | 2,5 | 5 310,0 | - | - | 2013 |
| 2/8-N-13 | 2,5 | 2 805,0 | - | - | 2003 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 127,0 | 36" | 128,0 | - |
| Intermediate | 20" | 458,0 | 26" | 464,0 | - |
| Intermediate | 13 3/8" | 1 525,0 | 17 1/2" | 1 531,0 | 1,93 LOT |
| Intermediate | 9 5/8" | 3 041,0 | 12 1/4" | 3 044,0 | 2,09 LOT |
| Liner | 7" | 3 918,0 | 8 1/2" | 3 923,0 | 2,15 LOT |
| Open hole | - | 5 023,0 | 5 7/8" | 5 023,0 | - |
Mud weight
54 measurements, one dot each, 0,10 to 2,00 g/cm³ against measured depth, water based.