2/8-N-13
Development, injectionInjectingCuttings
Drilled by BP Norge AS with West Epsilon in Valhall, 17.09.2003 to 26.09.2003 (9 days), to 2 805,0 m.
Water depth69,8 m
Total depth2 805,0 m MD
Vertical depth2 007,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table59,7 m
Formation at total depth-
RigWest Epsilon
Spud17.09.2003
Completed26.09.2003
OperatorBP Norge AS
Position56,3243 N, 3,3527 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Valhall gradient | 29,1 °C/km |
| Estimated at total depth from the gradient | 59 °C |
The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.